On 19th September 2016, the Specialist Hospital named after Fr. J. Popiełuszko in Włocławek received a new containerised generator with a capacity of 500 kVA. The facility has now been equipped with a backup power source. Currently, the generator provides reliable power to two hospital buildings: building number 13, housing the paediatric and internal medicine wards, and building number 15 – which has been modernised to accommodate neurology and ophthalmology departments, as well as outpatient clinics. It also serves as a backup power source for the MRI scanner. According to the engineers, the generator still has available power capacity that can be utilised for other hospital needs as part of its ongoing development.
The generator operates on a diesel engine, utilising diesel fuel to generate electricity. The unit, ordered by KPIM in a silenced, containerised version, has been located to minimise disruption to the surrounding area, in a secluded, wooded section of the grounds. It replaces a previously rented generator with a capacity of 150 kVA.
The cost of this project is almost 240,000 złoty.

