Skip to main content
Skip to content
EN

Kujawsko-Pomorskie Investment in Healthcare.
← Back to news

News

Contract signed for Building 5 at the Regional Specialist Hospital in Włocławek

On Friday, 10th April 2015, Kujawsko-Pomorskie Inwestycje Medyczne signed a contract with the contractor for a project entitled “Renovation, reconstruction, and expansion of building number 5 at the Provincial Specialist Hospital named after Blessed Father J. Popiełuszko in Włocławek,” under a design and build arrangement.

The contractor is committed to completing the project in accordance with Polish law, and their responsibilities will include the execution of a multi-disciplinary construction and implementation project, as well as obtaining all necessary opinions, approvals, and permits required by specific regulations pertaining to healthcare facilities.

Following the modernisation and expansion, the facility will house a neurological and ophthalmological department, along with associated spaces (offices, technical rooms, and storage areas). A separate entrance will lead to the ophthalmology and neurology clinics. The building will be adapted to meet the needs of people with disabilities.

The basement will accommodate storage rooms, staff changing rooms, utility rooms, and technical spaces. The ground floor will house the neurology clinic (in the location of the former rehabilitation clinic) and the neurological department. The first floor, in the extended section of the building, will accommodate the ophthalmology clinic, the ophthalmology department, and an operating suite. Additionally, the project includes the installation of lifts, including a bed lift, and an additional staircase within the clinic areas.

The project also includes the construction of a new section of fire access road (from Wieniecka Street) and the conversion of an existing road into a fire access road.

The scope of work includes: general construction, renovation, and adaptation works, as well as works in the following areas: sanitary, plumbing, ventilation, air conditioning, medical gas systems, electrical and low-current systems, and roadworks.

The contractor has 18 months to complete the project.

← Back to news

Cookie settings

Necessary — always active

Remembering your decision and the accessibility settings you choose, without tracking. The YouTube choice is valid for 180 days.

Consent allows embedded videos from Google Ireland Limited to be opened. When you open a video, Google receives your IP address and device information, may use cookies and browser storage, and process viewing data, including outside the EEA. A Google sign-in may link information to your account. The youtube-nocookie mode does not eliminate data processing. Turning this off and saving removes active players, but cannot recall data already sent to Google.

Privacy and cookies policy

Redirecting to the procurement platform

You are leaving for the external website platformazakupowa.pl. Choose “Continue now” to proceed, or “Cancel” to stay on this website.

Continue now