Skip to main content
Skip to content
EN

Kujawsko-Pomorskie Investment in Healthcare.
← Back to news

News

Psychiatric hospital building handed over to its operator

On St Nicholas’ Day, 6 December 2021, the psychiatric hospital — the penultimate building in the Regional Integrated Hospital’s new campus — is being handed over to its operator.

The psychiatric hospital was built as the final building within a new hospital complex located at 53-59 St. Joseph’s Street. Its distinctive design, comprising three wings, creates an open space on one side, featuring a beautifully landscaped area with winding pathways and various outdoor features, providing patients with a place to relax and unwind. Adjacent to the western wing, a small basketball court and an outdoor gym have been designed, allowing patients to enjoy some exercise in the fresh air. Inside the building, patients will also have access to gymnasiums. The creation of recreational, sporting, and rehabilitation areas has become an integral part of this modern psychiatric facility, reflecting the understanding that physical activity is a vital element in the treatment of depression and anxiety.

The four-storey hospital building features changing rooms and technical rooms in the basement. The ground floor houses the admissions area, as well as a paediatric department and a geriatric psychiatry department, alongside administrative offices and a chapel. The first floor will accommodate a women’s psychiatric ward and a men’s psychiatric ward, while the second floor will feature a clinical psychiatric ward, with separate male and female sections. The building is designed to accommodate a total of 196 patients. Each ward will include two- or three-bed rooms (with an additional bed on the children’s ward for parents), observation rooms, isolation rooms, nursing stations with dedicated preparation rooms, staff rooms, and toilet facilities for staff. In addition, there will be consulting rooms, diagnostic and treatment rooms, social areas, dining rooms, day care rooms, therapeutic and rehabilitation rooms, and ancillary spaces.

The new psychiatric hospital is also a very safe environment for patients. To ensure this, a number of safety measures have been implemented, including windows with internal panels made of safety glass that cannot be opened by patients, and doors that open outwards. The entrances to the wards are secured to prevent patients from leaving the ward without authorisation. In the individual rooms, there are doors resistant to damage, smooth and light-coloured walls, and flooring fitted with durable carpeting. This focus on safety also applies to the sanitary facilities and lighting. Monitoring systems have been installed in both the individual rooms and the gymnasium.

The departments with beds will be relocated to the new, aesthetically pleasing facility, which has a more residential feel rather than a “hospital” atmosphere. These departments are currently located at the Skłodowska-Curie and Mickiewicz sites. The Mickiewicz site will continue to house outpatient clinics for adults, as well as for children and young people.

A Mental Health Centre is currently being designed on Mickiewicza Street (detailed design work is underway). The Centre will occupy the building currently housing existing inpatient wards. The building will be redesigned and expanded. In addition to the clinics already mentioned, the facility on Mickiewicza Street will also include Day Patient Units, a Community Treatment Team, and a Registration and Coordination Point. Therefore, it will be a centre providing outpatient care exclusively. The design phase is expected to be completed in spring 2023.

← Back to news

Cookie settings

Necessary — always active

Remembering your decision and the accessibility settings you choose, without tracking. The YouTube choice is valid for 180 days.

Consent allows embedded videos from Google Ireland Limited to be opened. When you open a video, Google receives your IP address and device information, may use cookies and browser storage, and process viewing data, including outside the EEA. A Google sign-in may link information to your account. The youtube-nocookie mode does not eliminate data processing. Turning this off and saving removes active players, but cannot recall data already sent to Google.

Privacy and cookies policy

Redirecting to the procurement platform

You are leaving for the external website platformazakupowa.pl. Choose “Continue now” to proceed, or “Cancel” to stay on this website.

Continue now